Forward-Deployed Engineering09

We keep runningwhat we built,until you take it.

After handover, the same engineers who built the system watch it, page on it, re-score it as your records drift and change it when the work changes. A flat monthly fee, a written report every month, and any month you can take it in-house.

OPERATIONS STRIPRunning
MONTHLY REPORT
MONITORED
ALERTED
RELEASED
  1. queue depth over threshold · paged · cleared
  2. score dip on a new document type · golden set extended
  3. credential rotation · completed in window
Shape
Monthly, after handover
Fee
Flat, agreed before month one
Report
Monthly, in writing
Ends
Any month, when you take it in-house

FDE / 01The scope

What we run and watch.

Four things, each with a named person on the rota. The system stays in your accounts; what changes is who is looking at it.

  1. Uptime and incidents

    The pager goes to us first. An incident is acknowledged inside the agreed window, worked in your tools and written up the same day with what happened, what was done and what changes so it does not recur.

  2. Quality

    The system is re-scored on fresh cases against the golden set at an agreed interval, and the operating threshold is watched on live traffic. When a new kind of case appears, the golden set is extended and the score is reported before and after.

  3. Cost, credentials and dependencies

    Cost per case is tracked against the figure at cut-over. Credentials are rotated on schedule. Model, library and platform changes are applied behind the regression run, so an upgrade that lowers the score is held.

  4. Iteration

    Small changes, scoped and agreed in writing, are made inside the month: a new field, a new exception, a changed rule. Anything larger is written up as a scoped sprint, so the flat fee stays flat.

FDE / 02What you receive

6 ITEMS

One report, every month.

The report is written, not presented, and it says the same six things every month so a change from one month to the next is visible.

MONTHLY REPORT6 ITEMS
  • Uptime and incidents

    Availability against the agreed target, every incident with its cause and its fix, and what changed so it does not recur.

  • The score

    The golden-set score for the month, the live-traffic score beside it, and the cases that moved either one.

  • Volume and cost

    Cases handled, cases handed to a person, and cost per case against the figure at cut-over.

  • Changes made

    Every change merged in the month, with its pull request, its score before and after, and who approved it.

  • Housekeeping

    Credentials rotated, dependencies upgraded, the golden set extended, and what is scheduled for next month.

  • The recommendation

    What we would change next, what would need a scoped sprint, and whether the system is ready for your team to take in-house.

FDE / 03Specified

10 FIELDS

Operations, specified.

The terms as they stand before the first month. The system moves the detail; it does not move the shape.

Shape
Monthly, starting after the handover gate; renewed month by month
Fee
Flat and monthly, agreed before month one; no hourly billing and no per-incident charge
Who
The engineers who built the system, on a rota with a named first responder
Where
Your accounts, your monitoring, your repository; the system does not move
Access
Scoped to the system, granted under your identity provider, logged, and removed when the contract ends
Response
Acknowledged inside an agreed window, day and night for an outage, working hours for the rest
Re-scoring
On fresh cases at an agreed interval; the golden set extended when a new kind of case appears
Changes
Small ones inside the month, scoped in writing; larger ones written up as a scoped sprint
Report
Written, monthly, the same six headings every month
Ending
Any month, with notice; the handover manifest is re-run so your team takes a current system

FDE / 04Fit

Keep us or take it

Keep us running it when

  • Your team has no one to carry the pager for it yet
  • The workflow changes often enough that someone needs to be re-scoring it
  • The system is one of several and your engineers are on the others
  • You want the people who built it to be the people who are paged on it
  • The plan is to take it in-house, but not this quarter

Take it in-house when

  • An engineer on your side has been second on the rota for months without escalating
  • The monthly report has said the same thing for several months
  • Your team is already changing the system without asking us
  • The system is stable and its cost per case is where it was at cut-over
  • You would rather spend the fee on the next workflow

FDE / 05Questions

6 QUESTIONS

Asked about operations.

Is this a retainer?

It is a flat monthly fee for a written scope: run, watch, re-score, report and make small changes to a named system. It is not a bank of hours, and it does not stretch to cover work outside the scope; that is written up as a scoped sprint.

Does this replace handover?

No. Handover & Enablement still happens and the manifest is still ticked by your side. Operations starts after the gate, so your team could take the system at any point; we are running it, not holding it.

What counts as a small change?

Something an engineer can scope, build, score and ship inside the month without changing the shape of the system: a new field, a new exception, a changed rule, a new document type in the golden set. If it needs its own gate, it is a sprint.

Who is paged?

Our rota first, with a named first responder, then the owner on your side if the incident needs a decision from you. Your team can be second on the rota from the start, which is how taking it in-house usually begins.

How do we stop?

With notice, from any month. The handover manifest is re-run in the last month so your team takes a current system: the runbook up to date, the golden set current, the credentials rotated, our access removed.

Can you run a system you did not build?

Sometimes. It has to be scored first, so a golden set and a harness come before the first month; that is scoped on its own. If the system cannot be scored or has no runbook, a Production Sprint to bring it to that state is the honest starting point.

FDE / ENDStart

Handed over,still watched by the people who built it.

Thirty minutes with an engineer is enough to say what the rota would cover and what the monthly report would contain.