Forward-Deployed Engineering03
A pod joins your standups, your review queue and your pipeline, and ships workflows to production against goals written at the start of the quarter. Renewal is a decision made on what shipped.
FDE / 01The problem
Most AI backlogs are long because nothing on them reaches production. A pod does not add hands to the backlog; it changes what the team ships each month.
FDE / 02How a pod works
A pod is the one engagement that runs more than one workflow. These rules keep it from becoming staff augmentation.
Two or three workflows, each with a metric and an owner, signed before week one. The pod is judged on those, not on velocity.
One named engineer leads the pod, reports to the owner on your side weekly in writing, and is the person you hold to the quarter's goals.
Nothing is built that only the pod understands. Each workflow has an engineer on your side who has reviewed it, released it and rolled it back.
In the last week of the quarter both sides read what shipped and decide whether to run another. There is no notice period to work through and no automatic rollover.
FDE / 03The quarter
M1 – M3
One quarter, in months. The diamonds are the cut-overs and the review.
The goals for a quarter are fixed at its start. What is discovered during it goes on the list for the next.
FDE / 04What exists at the end
6 ITEMS
Six things, ticked by your side, before renewal is discussed.
Each one named at the start of the quarter, running on real traffic under your account.
Every commit in your repository, reviewed by your reviewers, intellectual property assigned before week one.
One harness, in your pipeline, with a golden set for each workflow and a regression run on every release.
One per workflow, executed by your engineers, not the pod's.
What shipped against the goals, what did not and why, and what the pod would run next.
Another quarter, a handover or a stop, decided in writing in the last week.
FDE / 05Specified
10 FIELDS
The terms as they stand before the first call. The goals move with the quarter; the shape does not.
FDE / 06Proof
3 ROWS
Illustrative engagements written end to end, chapter by chapter.
FDE / 07Questions
6 QUESTIONS
A pod is judged on workflows in production, not hours. Its goals are written before the quarter starts, its lead reports on them weekly, and renewal depends on what shipped. Staff augmentation gives you hands; a pod gives you an outcome per quarter.
A named lead who has taken systems into production, a platform engineer, and a data engineer where the workflows need one. You meet each of them before you sign, and the same people stay for the quarter.
The workflows named at the start do not change. What is learned during the quarter is written down for the next one. If a goal turns out to be impossible, the lead says so in the weekly report and the owner decides what replaces it.
Two or three, depending on the systems each has to connect to. That is agreed at scoping, in writing, before the quarter begins.
The Production Sprint takes one workflow to production in six weeks with one engineer. A pod runs several, in sequence, with a team, and builds the harness and the habits your engineers keep. Many organisations run a sprint first and a pod after.
The last two weeks of the final quarter are the Handover & Enablement: runbooks, decision records and a dry run by your engineers. The pod holds no standing access after it leaves.
FDE / ENDStart
Book a scoping call; you leave it with a view on what a first quarter would contain.